Construction of a Westar Pool starts with excavation of the ground.
Once we have a rough vision of the pool, a brickwork frame is built and reinforced steel is then tied and connected to the frame.
All plumbing and electricity for the lights are then installed hidden behind the steel.
Gunite concrete is then sprayed on the entire surface to ensure it will be watertight.
Once the Gunite is completed, the white stone surround is moulded into place.
The tiles are of your choosing and pool surround, complete your pool.